Plantronics 92639-01

$270.08

Plantronics SHR 2639-01 Headset – Stereo – Wired – Over-the-head – Binaural – Circumaural BTO NO RETURNS LONG LEAD TIME

SKU: 92639-01 UPC: Brand: Plantronics Condition: New Category: Tag:

Description

Plantronics SHR 2639-01 Headset – Stereo – Wired – Over-the-head – Binaural – Circumaural BTO NO RETURNS LONG LEAD TIME

The SHR 2639-01 is a Premium Circumaural headset Designed for use with Plantronics Dual-Channel Adapters. Product Type:Headset
Sound Mode:Stereo
Connectivity Technology:Wired
Form Factor:Circumaural
Earpiece Design:Over-the-head
Earpiece Type:Binaural
Microphone Design:Boom
Manufacturer Part Number:92639-01
Manufacturer Website Address:http://www.poly.com
Packaged Quantity:1
Manufacturer:Poly
Product Model:SHR 2639-01
Product Name:SHR 2639-01 Headset
Country of Origin:United States
Weight (Approximate):1.14 lb
Height:9″
Width:4.7″
Features:Noise Reduction|Adjustable Headband|Quick Disconnect|Adjustable Boom